Summary
CAPE CANAVERAL, Fla., Nov. 5, 2010 /PRNewswire-USNewswire/ -- NASA has postponed the launch of space shuttle Discovery to no earlier than 4:05 a.m. EST on Nov. 30. The delay will allow engineers and technicians time to diagnose and repair a hydrogen gas leak detected while filling the external tank Friday morning. They also will assess a foam crack on the external fuel tank's liquid oxygen intertank flange. The crack was discovered during de-tanking operations.
(Logo: http://photos.prnewswire.com/prnh/20081007/38461LOGO)See the full content of this document
Extract
Nasa Postpones Space Shuttle Discovery Launch
(Logo: http://www.newscom.com/cgi-bin/prnh/20081007/38461LOGO)
The leak was at the Ground Umbili...See the full content of this document
Sponsored links
